image description

Pittsfield Closes Taconic, Reid Because of Staff Shortages

By Brittany PolitoiBerkshires Staff
Print Story | Email Story

PITTSFIELD, Mass. — Taconic High School and Reid Middle School will be closed on Thursday, Jan. 6, and Friday, Jan. 7, because the schools do not have enough staff to open. Both schools are anticipated to reopen on Monday but families will be notified by Sunday.

Superintendent Joseph Curtis had cautioned on Wednesday that school closures could happen because of the recent surge in COVID-19 cases.

He sent out a video and written communication to Pittsfield Public School families announcing that the current, historically high case counts could eventually warrant the closure of one, many, or all schools.

There is no set metric for school closure but the cases have been rising daily.

"As you know, we provide a COVID-19 case count report, which currently shows 108 active students and staff cases, this is one of the highest number of cases that our school system has on record since the beginning of the pandemic," Curtis said on Wednesday.

"Like many of our surrounding districts, along with school districts across the nation, we have been short-staffed in some areas since the start of the 2021-2022 school year. In some schools, staff shortages are approaching a level that could interfere with our ability to safely supervise students."

The district's surge mirrors the one happening in Pittsfield, which currently has 591 estimated actively contagious cases and a case rate of 159.9 per 100,000 people.

On Wednesday, the state reported 292 new cases for the county, a record daily number since the start of the pandemic in March 2020.



Curtis added that schools can also be closed if it is determined that they cannot operate safely because of staff shortages.  Any schools closed will have to make up the days at the end of the year, similar to snow or weather days, and sporting events would be postponed.

"The most recent rise in COVID-19 cases after the December vacation could cause a school-specific or district circumstance that makes it necessary to close one school, multiple schools, or the entire district," He said.

"There is no threshold or number that drives a decision to close, rather an analysis of each school’s staffing levels and the ability to operate school safely. Principals are maintaining a staffing level spreadsheet throughout each day and night that I and other district leaders are watching closely.  Principals that have staffing levels of concern communicate with me each night and early morning."

The state Department of Elementary and Secondary Education is resisting calls for returning to remote learning. State officials say schools will be provided with the supplies and testing kits they need to stay open. However, rising case counts and staffing shortages for quarantines are putting pressure on schools. In North Adams, school officials on Tuesday said the system is "on the edge" of not being able to provide supervision to keep kids in class. 

The Pittsfield Board of Health was expected to have a routine COVID-19 update from Director of Public Health Andy Cambi and discuss the city's masking directive but the meeting, to be held in person, was canceled. It would have been the first since the post-holiday surge.


Tags: COVID-19,   Pittsfield Public Schools,   


More Coronavirus Updates

Keep up to date on the latest COVID-19 news:


If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Council OKs $3M Borrowing for Failing PHS Boilers

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — The City Council has authorized the borrowing of $3 million for new boilers at Pittsfield High School — a project that was originally going to be funded by ARPA.

The nearly 100-year-old boilers are original to the building and have exceeded their useful life, officials say. They are converted locomotive engines that are extremely inefficient and expensive to maintain.

The replacement design was recently completed and a low bid was received. After looking at the numbers, it was clear that the allocated $1 million in American Rescue Plan Act funds would not be enough.

"$213,210 was spent on emergency repairs and the design work for the replacement project," Finance Director Matthew Kerwood confirmed in an email.
 
"The low and only bid for the replacement was $2,482,000, however given the complexity of this project I felt that a 20 percent contingency would be needed which gets to the $3,000,000 authorization. If the entire amount is not needed, the remaining unused balance will be rescinded at some point in the future."

The project is also time-sensitive, as one boiler is non-operational and another is severely compromised. If they fail during the heating season, the school will have to close.

"The contractor that was the low bid, in 30 days he can walk away from that bid if he wants to, and the other problem is I need to get this project underway to hopefully get them in and running by the time school reopens up for wintertime," Building Maintenance Director Brian Filiault explained.

"This is a major project, a major project. We're taking three locomotives out of that building and it's no easy thing. I mean, the building is built around it and we have a small portal that we actually will be able to get it out, we'll have to crane everything else. It's a very labor-intensive, very hard job, and I'm afraid of the timeframe because I can't run those boilers again. They've gone as far as they're going to go."

View Full Story

More Pittsfield Stories